Back to Overview

What are the key points for disassembling and installing the punch press feeding machine?

Sep 10,2025

What are the key points for disassembling and installing the punch press feeding machine?

In modern companies, machinery and equipment are essential auxiliary material transportation tools. The punch press three in one feeding machine is a commonly seen equipment in current light and heavy industries. For mechanical products, they often appear more complex and require professional personnel to disassemble and install them for greater safety. In current factories, machinery and equipment are usually more commonly used. Generally speaking, factories that produce packaging machines will provide certain technical guidance and services for factories that purchase such products. Some will also assist with disassembly and installation. Let's first talk about the key points for disassembling and installing punch press feeding machines?

1. After punching and dropping, install the mold and place the three in one delivery machine on the feeding end, usually facing the machine, arranged from left to right. Then unscrew the fixing screws on the host seat and click the control operation frame to raise or lower on the touch screen of the three in one delivery machine console. The main body automatically aligns the height of the material up and down,

2. Place the material roll on the feeding trolley of the three in one feeding machine, use the handle button (which can also be manually operated on the touch screen) to lift the stop wheel and adjust the width between the two stop wheels according to the material width. Start the feeding trolley, insert the roll material into the support tile plate of the reduced expansion and contraction drum, start expansion, and the oil pressure system controls the expansion and contraction drum to tighten the material roll. The feeding trolley descends and returns to its original position.

Key installation points for the three in one feeding machine:

1. After disconnecting the power switch of the control panel of the fixed power box, connect the 3-phase 380V power supply, turn on the power switch, and confirm if it is normal. If there is any abnormality, the power supply will be immediately cut off.

2. Control the handle and adjust the height by pressing "rack up" or "rack down", and keep it level with the mold. Be careful to loosen the screws of the NC kWh rack, otherwise the action will be ineffective. There are three limit switches, with the top limit switch being the main control, the middle limit switch being the upper limit, and the bottom limit switch being the lower limit.

After installing all circuits, please check if the installation is appropriate and complete. After confirmation, install the machine sealing plate on the machine.

Knowing the above installation points will make it easier to have a clear understanding of the installation of the feeding machine next time and prevent errors.

Hot Tags:

Contact Us

E-mail:
gsw@chfeeder.com

Phone/WhatsApp:
+86-13751226330

Address:
Jiangnan Village, Gaoqiao Town, Haishu District,
Ningbo City, Zhejiang Province

Request Quote

If you have found your desired products or want to design your exclusive products, please feel free to contact, we are here for you 24/8.

Submit